Suara

WHAT WE ARE BUILDING

Verify your own line. See the total. See nothing else.

We do not manage buildings, convene meetings, hold funds, or rule on whether a motion carried. What we hold is the tally, and it is built so that no one party can compute it privately.

What one owner can check afterwards
Unit 12-04Verification slip
Your floor area72 m²matches the deed
Your weight1.14%of the fixed register
Proxy granted to—none for this motion
Position recordedAgainstas you cast it
Register total8,412 m²fixed before voting opened
Announced result61.0% forconsistent with the parts

Six lines. None of them tells you how any neighbour voted, and all six together are what make the announced number checkable.

  1. 01

    The register is fixed before the vote

    Weights are set from the deeds and the total is fixed at that moment. It cannot be adjusted after voting opens to change what a majority means.

  2. 02

    Proxies are granted explicitly

    An owner assigns their weight to a named holder for a named motion. The grant is visible to the owner who made it, not inferred from a folder.

  3. 03

    Owners vote their weight

    Each position is recorded against the weight that owner actually holds, and the owner can confirm afterwards that this is what was counted.

  4. 04

    The result follows from the parts

    The announced total is the sum of the recorded positions rather than a figure produced separately and asserted.

None of this stops a manager arguing that a motion should have carried. It stops them being the only person able to say what the number was.